|
The original design called for a 60 mil HDPE liner over a 16 oz.
geotextile underlayment fastened into an embed strip poured along
the bottom footer of the dam face.
CLI
proposed an alternative 45 mil RPP
that could be fabricated into 5 panels and installed over the uneven
facing provided. |